Jump to main content
Phone/WeChat
134 170 46218
Copied,Please add me on WeChat

Project Feasibility Study

项目可行性研究应先核对实际主体、Activities and this matter,Confirm registration separately again、Professional work and ongoing maintenance arrangements。First distinguish the continuity of the subject、Equity changes、Asset Transfer and Establishment of a New Entity。contract、Account、Whether the licenses and debts need to be updated separately,Should be confirmed in combination with actual transactions and applicable systems。

Service Overview

项目可行性研究应先核对实际主体、Activities and this matter,Confirm registration separately again、Professional work and ongoing maintenance arrangements。First distinguish the continuity of the subject、Equity changes、Asset Transfer and Establishment of a New Entity。contract、Account、Whether the licenses and debts need to be updated separately,Should be confirmed in combination with actual transactions and applicable systems。

Nature of the matter and applicable boundaries

First distinguish the continuity of the subject、Equity changes、Asset Transfer and Establishment of a New Entity。contract、Account、Whether the licenses and debts need to be updated separately,Should be confirmed in combination with actual transactions and applicable systems。

Centered on the registration number,Establishment documents、All changes、Current articles of association and existing materials arranged correspondingly;When a name or personnel inconsistency is found,Indicate the time and basis for changes。

material、Responsibility and Result Verification

Cannot be presumed in this way。Internal approval、External registration、Separate assessment of contract consent and regulatory approval,Save each file and the effective nodes。

Clearly list the program study、Legal document review、Professional signature、Who is responsible for registration submission and handover respectively?;Verify the qualifications of the practitioner when carrying out regulated work,Do not equate coordination with statutory signing。

Check registration results、Current Articles of Association、Record book、Original、Accounts and banks and contract parties that need to be notified,You cannot use a single form sent by the service provider as proof of completion.。

Project Feasibility Study:Processing conditions、List of Materials and Official References

项目可行性研究由不适用(专业服务)主管。Is it applicable、Handle according to which category of matters,Depends on the subject qualifications、Business activities and actual location/personnel arrangements;Newly established under the same name、change、continue、Cancellation handled separately,Cannot replace each other。

30 Second key point

  • Competent authority:不适用(专业服务)
  • First, look at the conditions:明确项目边界、产品方案与建设规模。
  • 研究编制:3–8 周
  • Validity period:报告对应编制时点,实施前需更新。
Supervisory/Approval Authority
不适用(专业服务)
Main basis
投资项目核准/备案要求(发改委/行业主管部门)
Handling method
Online declaration + window/on-site verification (depending on the matter)
Validity period
报告对应编制时点,实施前需更新。

Scope of application:First determine which category it belongs to

Situations that usually require handling:

  • 拟投资新项目、需要立项或融资的企业
  • 需要评估市场、技术与财务可行性的投资人

Easily mistaken as needed、But situations that should be verified separately:

  • 已有成熟方案、仅需执行的项目

Core Conditions (Checked Item by Item)

  1. 明确项目边界、产品方案与建设规模。
  2. 分析市场供需、竞争格局与价格趋势。
  3. 测算投资、cost、收益与现金流,做敏感性分析。
  4. 评估政策、Environmental friendly、能耗与合规要求。

List of materials and common return points

Organize according to acceptance criteria;portion、The requirements for original document verification shall be subject to the current list of the accepting authority.
Material Key Points / Common Reasons for Returned Items
项目概况与方案
市场调研数据
投资估算与资金计划
政策与选址资料

Review and On-site Inspection Focus Points

  • 市场数据来源不明,结论可信度低。
  • 投资估算漏项,导致资金缺口。
  • 未评估政策与审批风险。

time limit、Validity Period and Subsequent Obligations

project illustrate
研究编制 3–8 周
Validity and Renewal 报告对应编制时点,实施前需更新。

Cost structure (listed separately),Avoid vague punches

按项目规模计费;行业专题调研另计。

Risk and Responsibility Boundaries

  • 可行性研究不替代审批。
  • 假设变化会导致结论失效。

Official Basis and Verification Entry

Basis / Entrance Issuing Authority Verification method
投资项目核准/备案要求 发改委/行业主管部门 施行 现行有效;The current valid text shall prevail
National Development and Reform Commission — Visit

Date of consultation of the above materials:2026November 12。The provisions of the regulations shall be based on the officially published current text.;Service guidelines have regional differences and version updates,The actual acceptance requirements shall be subject to the standards of the accepting authority at the current period.。

illustrate:This page is a guide for handling conditions and organizing materials,Does not constitute legal advice、Regulatory approval or approval commitment。Submit application、On-site verification、The issuance of certificates and the decision to open accounts are both independently made by the competent authority or the bank.;Specific scope of services、The costs and deliverables shall be subject to written authorization.。

Scope of Services

Define the consultant's work according to the actual matters this time、The respective scope of work of professional institutions and external audits。

Item and Scope Check

Distinguish this actual business、Planned tasks and work that need to be handled by other professional organizations。

Data and Missing Items Compilation

Bring up existing records、Support evidence compared with formal requirements item by item,Record issues to be completed。

Results and subsequent handover

Verify agreed delivery、Submit or other results,List unfinished matters and ongoing maintenance。

Required Documents

The following are directions for the initial communication and information verification,The official list is according to the current acceptance requirements、Confirmation of the subject and actual matters。

  • Entity Registration、Existing qualifications and authorization materials
  • Practical activity、contract、Transactions or assets and the corresponding supporting documents
  • Equity、personnel、A truthful description of the location and this change
  • Original notice、All previous handling records and the matters pending confirmation this time

Application Process

Step 1

Confirm entity、Actual activities and this goal

Step 2

Organize existing records and supporting materials,Check applicable requirements

Step 3

Handle and coordinate professional work according to explicit authorization

Step 4

Check results、Original documents and subsequent responsibilities handover

Key Considerations

This page is for the scope of matters and preparation instructions,Does not replace individual laws、tax、Audit or other professional opinions。Processing conditions、Government fees、Processing time and results are determined according to the applicable regulations and review.,No unified guarantee。

List the consultant's work separately before commissioning、government fees、Capital or balance requirements、Professional signing and other third-party fees;Check the final records and items that still need to be handled during the handover。

Image Source and License