Hong Kong takes action to ensure smooth flow of Hong Kong-Zhuhai-Macao Bridge to Hong Kong,What are the procedures for applying for license plates in Guangdong and Hong Kong? According to Hanken,Hong Kong-Zhuhai-Macao Bridge opened to traffic、Coupled with the continued development of Lantau Island and Hong Kong International Airport,Traffic load on North Lantau Highway continues to increase,The number of traffic accidents is on the rise。
The Hong Kong Transport Department launches 11 measures to strengthen emergency response and divert traffic on the Hong Kong-Zhuhai-Macao Bridge,And starting from the 1st of this month,Lantau Main Line relaxes strong wind speed limit and wind speed standard for closed center line,Reduce traffic control times by 4 to 5 times per year。
Infrastructure projects in North Lantau continue to develop,Significant increase in vehicles traveling on Lantau Link,There were 83 accidents on the Lantau Link and 86 accidents on the North Lantau Highway last year and the year before last.,In April and July this year, "skewer" traffic accidents occurred, causing massive traffic jams.。
Liu Hanwei, chief engineer of the Hong Kong Transport Department, said,The Department launches 6 measures to strengthen emergency response,including when necessary
Require
MTR increases frequency of Airport Express and Tung Chung Line、Add "Airport Express Station" road signs near Tsing Yi Station、Installation of mobile variable message display on North Lantau Highway、One of the trailers at Tung Chung East Interchange was relocated to Siu Ho Wan section,Install 45 traffic detectors、Strengthen emergency traffic management plans and drills。
Liu Hanwei continued,The traffic capacity ratio of the Hong Kong-Zhuhai-Macao Bridge will be approximately 0.8 in 2025,It is expected that after the bridge is opened,Fewer construction vehicles entering and exiting the bridge,But airport island traffic 'not expected to be congested',But it will be busier”,A series of diversion measures will be taken。
Assistant Commissioner for Transport(Management and Paratransit)Li Yanfang said,North Lantau Highway will still have sufficient capacity after the bridge is opened to traffic,Since May this year, five measures have been launched to divert cars from Hong Kong, Zhuhai and Macao.,Including Hong Kong-Zhuhai-Macao Bridge local construction vehicles are restricted to use the Lantau Link during non-peak hours, etc.。
in addition,From August 1,The Transport Department will implement new standards for strong wind traffic control on Lantau Link and Ting Kau Bridge,When the 10-minute average wind speed reaches 40km/h,A speed limit of 50km/h will be implemented、When the speed reaches 50km/h, the center line will be closed.,Wind-exposed vehicles are prohibited from using the bridge deck when the speed reaches 60km/h.,Replacing the hourly average wind speed standard adopted in the past,Through the media 45 minutes before the implementation of the first phase、AA、Distribution of web pages and mobile apps, etc.。
Hong Kong Highways Department Chief Engineer Chan Wai-yee predicts,After adopting new indicators,The number of strong wind traffic controls implemented per year could be reduced by 4 to 5 times,It is expected to reduce traffic congestion on the Lantau Link。
The first category of Hong Kong, Zhuhai and Macao license plate application requirements is that Hong Kong enters the mainland via the bridge.,and receive the indicator of the Mainland license plate:For overseas investment enterprises (individuals) investing in our province,Regardless of the amount of investment,Enterprises in the province that have a cumulative tax payment of more than 100,000 yuan within 3 years (including the year of application) can apply for a commercial vehicle quota to pass through the Hong Kong-Zhuhai-Macao Bridge port.;Tax payment of more than RMB 500,000,Can apply for 2nd vehicle;100Those with more than RMB 10,000 can apply for a third vehicle。
The second type is from the mainland entering Hong Kong via the HZMB.,And receive the indicator of Hong Kong license plate:State-owned enterprises approved in our province、collective enterprise、private enterprise,3The total amount of tax paid within the year (including the year of application) is more than 1 million yuan。
Simple process for applying for license plates in Hong Kong, Zhuhai and Macao:
- Establishing a foreign-invested company
- Foreign-invested companies pay taxes
- Print tax payment certificate
- Submit materials for review
- After passing the review, make an appointment to submit the materials in the physical hall.
- Please wait 10 working days after submitting the materials at the physical hall.
- Receive approval documents,Make an appointment for a car inspection
- Vehicle driving license application
- Fixed number blocking
About Hong Kong Xintong
Hong Kong Xintong focuses onGuangdong and Hong Kong license plates、Shenzhen Hazardous Chemicals Business License、Shenzhen labor dispatch licenseandShenzhen Charity Foundationapplication services,Assist customers to applyShenzhen travel agency business license、Shenzhen pawn shop business license、Shenzhen auction house license and other mainstream domestic financial licenses,Support enterprises to achieve compliance expansion of cross-border financial business。Also availableODI overseas investment registration、International travel agency registration and other services,Help enterprises expand their presence in international markets。Provide one-stop compliance solutions for enterprises。To learn more,Please contactHong Kong Information Communications Consultant。
Port communication





